Investor: Spółdzielnia Mieszkaniowa Gocław Lotnisko/S.M. Orlik-Jantar

Time of construction:

Building C: 04.2022-12.2023

Building D: 09.2021-04.2023

Building E: 02.2020-10.2021

Project: Plano Sp. z o.o./FS&P ARCUS Sp. z o.o. BIURO ARCHITEKTONICZNE

Area:

Building C: approx. 12,000 sq m

Building D: approx. 12,021 sq m

Building E: approx. 9,330 sq m

Scope of work:

Residential buildings with a one-storey underground garage with a height of 1-8 above-ground storeys. Its height measured from the lowest entrance at the building is 26.77 m. In the underground part and on the ground floor, there will be one single-level garage unit, as well as technical rooms and storage rooms. Ramps lead to the garages enabling collision-free, independent entry and exit from each of the premises. Vertical communication consists of 4 staircases A, B, C, D equipped with 4 passenger lifts.